Tool
Exploration stages
How a resource project moves from a line on a map to a working mine. Very few make the whole journey, and projects move backwards as often as forwards, so treat this as a sequence of questions rather than a conveyor belt.
-
Target generation
Desktop work, geology and old records identify ground worth looking at. Nothing has been found; something is worth looking for.
-
Geophysics and geochemistry
Surveys and soil sampling narrow a licence area down to a handful of anomalies. Still nothing drilled.
-
Early exploration drilling
First holes into the best anomalies. Most fail. This is where the majority of junior companies live.
Projects we cover at roughly this stage 29
- ARK Arkle Resources Namibian Uranium Portfolio, Aughrim lithium project, Stonepark zinc-lead project, Makgadikgadi lithium-brine licences, Irish gold projects
- GMET Guardian Metal Resources Tempiute tungsten project, Garfield copper-gold-silver project, Golconda gold project
- PALM Panther Metals Obonga project, Wishbone prospect, Awkward prospect, Dotted Lake project
- FOX Focus Xplore Bay Road property, Iva property, Oba property, White Pine property, Pearl property, Ellie property, Burrows projects
- CGNR Conroy Gold and Natural Resources Discs of Gold project, Clay Lake target, Creenkill target, Orlock gold trend, Skullmartin gold trend
- ROCK Rockfire Resources Marengo gold project
- 80M 80 Mile Jameson Land Basin hydrocarbon project, Disko-Nuussuaq nickel-copper-cobalt-PGE project, Qullissat targets, Finnish assets
-
Discovery
Drilling hits mineralisation that continues between holes. The point at which a company stops being a prospect and becomes a project.
-
Resource definition
Enough drilling to estimate tonnes and grade to a reportable standard, first inferred, then indicated and measured.
Projects we cover at roughly this stage 3
- PALM Panther Metals Winston Tailings project
- CGNR Conroy Gold and Natural Resources Clontibret gold-antimony deposit
- ROCK Rockfire Resources Plateau gold-silver deposit
-
Economic studies
PEA, then pre-feasibility, then definitive feasibility. Each asks whether the deposit can be mined at a profit, in progressively more detail.
Projects we cover at roughly this stage 1
- GMET Guardian Metal Resources Pilot Mountain tungsten project
-
Permitting
Environmental and social approvals. Often the longest single stage, and the one least under the company's control.
-
Construction
Financing is in place and the mine is built. Capital intensive and the point of maximum funding risk.
Projects we cover at roughly this stage 4
- GROC GreenRoc Strategic Materials Amitsoq graphite project
- ROCK Rockfire Resources Molaoi zinc-lead-silver-germanium project
- 80M 80 Mile Dundas ilmenite project, Greenswitch / Ferrandina biodiesel, SAF and green hydrogen facility
-
Production
The mine operates. A different business entirely from exploration, and it needs different people.
Projects we cover at roughly this stage 1
- GROC GreenRoc Strategic Materials Active anode material pilot plant
Stage assignments are our reading of what each company has published, not a company statement, and a project can sit across two stages at once. Not every project follows this path in order.